top of page

New Spatial Planning Framework: Major shifts in out-of-plan development, a halt to active building permits, and all the changes affecting the real estate market

Writer: Συμεών Βογιατζόγλου
Συμεών Βογιατζόγλου
11 hours ago
2 min read

🛑 1. Suspension of construction work, even at legally permitted sites

  • What is changing: In areas where Special Urban Plans (SUPs) are being developed, the administration will now be able—via a specific administrative act—to "freeze" construction work, even for projects that already hold a valid building permit.

  • The impact: This creates significant investment risk, which is expected to lead banks to impose stricter financing terms.


🛣️2. “Crackdown” on construction outside town plans & unauthorized structures

  • Recognition of roads: The recognition of municipal/community roads located outside town plans will be carried out exclusively via Presidential Decree. If multiple routes exist between settlements, only the primary route will be recognized; consequently, plots of land adjacent to the alternative routes will lose their right to build.

  • Minimum plot size requirements: For settlements that were delineated in the past, the minimum plot size is set between 2,000 and 4,000 square meters, subject to the mandatory requirement of having a frontage of at least 15 meters on a public road. It is clarified that there is no blanket right to build on 2,000-square-meter (2-stremma) plots.

  • Category 5 unauthorized structures: The submission platform for the regularization of such structures remains firmly closed for private properties.


✍️ 3. Transfer of responsibility to private-sector engineers

  • Abolition of prior review: In the case of special investment permits, the state is withdrawing from the prior review of supporting documentation in the interest of speed.

  • Full risk: The engineers who prepare the studies become solely accountable for the accuracy and legality of the data, assuming the full burden of any civil and criminal consequences.


⚠️ The major market challenges

  • Delays: The involvement of the Council of State (CoS) to issue Presidential Decrees in street recognition threatens to strand owners for years.

  • Ambiguity: Having engineers assume full responsibility, in an environment with often unclear ownership status, dramatically increases their occupational risk.


Comments


Inspiration in your email.

  • The most interesting news and trends in the real estate market

  • Useful tips and insights on property ownership and investment

  • Inspiration and ideas to make the most of your property

  • Don't miss it — always stay informed!

SOCIAL
  • YouTube
  • Instagram
  • Facebook
  • LinkedIn
NAVIGATION

Buy  |  Sell  |  Rent  |  Valuations

CONTACT
TAX ADDRESSS
THE OFFICE

ΑΡ.ΓΕ.Μ.Η.: 159391703000  |  Ε.Ε.Α.: 394494

Terms of use: Translation disclaimer | Privacy policy | Disclaimer

© LYX ESTATE 2025-2026
ΕΚΠΑ LOGO

Certified real estate broker and appraiser from the N.K.U.A.

bottom of page